![]() Propose listed (not site-built) wood window assemblies to the Landmarks Commission.These default values do not meet the prescriptive values required by the NYCECC in either Chapter R4 or Chapter C4. Section R3 or C3 requires you to use default thermal and solar heat gain values for site-built windows. Landmarked buildings are not considered historic unless the building is also either the National or State Register or certified as eligible for such designation, and must comply with the NYCECC. Roof recover – neither deck nor insulation will be exposed ![]() NA – alteration would create hazardous conditionĬlimate Zone 4A – 2016 NYCECC Chapter C4 – Application to perform roof replacement Item Description NA – Insulation would block air circulation in cavity, creating moisture problems leading to differential expansion and contraction (cracking) and potentially mold Energy AnalysisĬlimate Zone 4A – 2016 NYCECC Chapter C4 – Alt 2 Application to renovate apartment Item DescriptionĪpartment #7A renovation to move interior partition and create new bathroom and smaller closet – exterior wall, HVAC, SWH are not affectedĬlimate Zone 4A – 2016 NYCECC Chapter C4 – Application to perform Local Law 11 work Item Descriptionīrick replacement and repointing in brick and CMU wall with 2" air gap, for Local Law 11 compliance – greatest area of brick replacement is 20 SF ![]() See the Energy Code Forms page for more information. The form will not be required for permit or sign-off. ![]() You can simply check No to all lines, if appropriate, sign and seal the form and submit it with your drawings. You will also be required to submit a completed TR8 form for plan approval. If no work actually needs to comply with the NYCECC, you can enter NA in the column marked Proposed Values and NA in the column marked Prescriptive Values and provide the citation for the provision that allows you to not comply where applicable. We recommend that you use the tabular analysis format for this, see sample below. You should then address the specific scope of your work in your energy analysis. On the PW1 form in Section 10, you need to check compliance. Any new building that is required to comply with the residential provisions of the 2016 NYCECC is required to perform both IA6 Air sealing & insulation – visual and IA7 Air sealing and insulation - testing and indicate "yes" in Section 3A of the TR8 form.Īny new building that is required to comply with the commercial provisions of 2016 NYCECC and is between 25,000 and 50,000 sqft of floor area and less than or equal to 75 feet in height is required to perform IIA7 Air sealing and insulation - testing and indicate "yes" in Section 3A of the TR8 form.Īny new building that is required to comply with the commercial provisions of 2016 NYCECC and is greater than or equal to 50,000 sqft in floor area is required to perform both IIA6 Air sealing & insulation – visual, if the Air Barrier Continuity Plan is the chosen method of compliance, or IIA7 Air sealing and insulation – testing, if whole building pressurization testing is the chosen method of compliance.Īll other buildings required to comply with the commercial provisions of the 2016 NYCECC shall require either IIA6 Air sealing & insulation – visual or IIA7 Air sealing and insulation - testing.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |